1 00:00:18,353 --> 00:00:22,420 The surface mining of materials like coal and other resources 2 00:00:22,421 --> 00:00:24,223 require a synergy between 3 00:00:24,225 --> 00:00:27,656 a multitude of mobile and stationary equipment. 4 00:00:27,658 --> 00:00:30,735 From removing overburden with draglines, 5 00:00:30,736 --> 00:00:32,836 loading haul trucks with shovels 6 00:00:32,838 --> 00:00:37,001 and all the processing, sorting and conveyance equipment involved 7 00:00:37,003 --> 00:00:40,646 surface mining companies require the right piece of equipment 8 00:00:40,648 --> 00:00:42,825 to be functional when they need it 9 00:00:42,826 --> 00:00:45,380 to meet production demands. 10 00:00:45,381 --> 00:00:49,931 Safety is priority number one in the mining industry. 11 00:00:49,933 --> 00:00:52,965 The sheer size and close work proximities 12 00:00:52,966 --> 00:00:56,630 of all this equipment make this mandatory. 13 00:00:56,631 --> 00:01:01,221 All equipment must be closely monitored for safe operations. 14 00:01:01,223 --> 00:01:04,838 Not having cracked or otherwise compromised equipment parts 15 00:01:04,840 --> 00:01:08,150 is a crucial part of a safe operation. 16 00:01:08,151 --> 00:01:11,120 The falling of a “boom” from a large dragline 17 00:01:11,121 --> 00:01:15,516 can cost millions of dollars even without human injury. 18 00:01:15,518 --> 00:01:18,326 These costs can be incurred from repair, 19 00:01:18,328 --> 00:01:20,695 replacement, investigation, 20 00:01:20,696 --> 00:01:23,913 down time and lost production. 21 00:01:23,915 --> 00:01:25,980 The loss of a single haul truck 22 00:01:25,981 --> 00:01:28,366 can slow production rates significantly 23 00:01:28,368 --> 00:01:32,845 since they carry from 40 to 100 tons of product per load. 24 00:01:32,846 --> 00:01:36,050 Repair services and parts for such massive vehicles 25 00:01:36,051 --> 00:01:39,801 is costly and time consuming so early detection 26 00:01:39,803 --> 00:01:42,263 and monitoring of potential problems 27 00:01:42,265 --> 00:01:45,175 in all equipment is crucial. 28 00:01:45,176 --> 00:01:48,586 Mining companies worldwide, like most industries, 29 00:01:48,588 --> 00:01:52,178 utilize non-destructive testing (NDT) techniques and instruments 30 00:01:52,180 --> 00:01:56,533 to ensure safe and reliable operation of their equipment. 31 00:01:56,535 --> 00:01:59,195 Many hire outside testing services, 32 00:01:59,196 --> 00:02:03,350 but many perform the inspections with their own personnel. 33 00:02:03,351 --> 00:02:06,383 Stringent NDT testing on mobile equipment 34 00:02:06,385 --> 00:02:09,980 is essential as these vehicles are usually very large, 35 00:02:09,981 --> 00:02:11,838 under massive stresses 36 00:02:11,840 --> 00:02:14,485 and interact around other mobile equipment operators 37 00:02:14,486 --> 00:02:16,835 and support personnel. 38 00:02:16,836 --> 00:02:19,741 Advancement in the core NDT technology 39 00:02:19,743 --> 00:02:23,538 of industrial ultrasound have led to improved inspections 40 00:02:23,540 --> 00:02:26,555 and therefore increased productivity and safety 41 00:02:26,556 --> 00:02:29,471 in surface mine operations. 42 00:02:29,473 --> 00:02:31,283 The improved ease of use, 43 00:02:31,285 --> 00:02:34,763 reduced cost and increased industry wide acceptance 44 00:02:34,765 --> 00:02:37,036 of Phased Array Ultrasound 45 00:02:37,038 --> 00:02:40,408 have allowed increased access to mining operations 46 00:02:40,410 --> 00:02:44,175 to improve their NDT programs with this exciting technology. 47 00:02:44,176 --> 00:02:46,191 Phased array has been great for us because 48 00:02:46,193 --> 00:02:50,598 we are able to get into a lot more areas than we were able to before. 49 00:02:50,600 --> 00:02:54,110 With conventional UT you are pretty limited on your access 50 00:02:54,111 --> 00:02:57,578 You have to have such a greater soundpath 51 00:02:57,580 --> 00:03:01,373 so with phased array we get all those other angles 52 00:03:01,375 --> 00:03:03,165 in a shorter span. 53 00:03:03,166 --> 00:03:06,035 We do a lot of work to AWSD 1.1 54 00:03:06,036 --> 00:03:08,745 and table six two and six three. 55 00:03:08,746 --> 00:03:13,535 And those require us to use forty-five sixty and seventy 56 00:03:13,536 --> 00:03:15,751 depending on the thickness of the part, 57 00:03:15,753 --> 00:03:17,866 so we can get that all in one shot 58 00:03:17,868 --> 00:03:22,906 so it really saves the time it takes us to UT a weld. 59 00:03:22,908 --> 00:03:25,895 Phased array offers wider coverage, 60 00:03:25,896 --> 00:03:27,398 better POD, 61 00:03:27,400 --> 00:03:29,068 recordable results, 62 00:03:29,070 --> 00:03:32,395 and increased ability to monitor defects for growth 63 00:03:32,396 --> 00:03:37,058 while retaining portability for difficult access areas. 64 00:03:37,060 --> 00:03:39,941 Because of the flexibility of phased array 65 00:03:39,943 --> 00:03:43,231 a single probe can be applied to many different inspection 66 00:03:43,233 --> 00:03:48,081 scenarios and applications without changing equipment. 67 00:03:48,083 --> 00:03:52,081 Mining equipment ultrasound applications can be difficult; 68 00:03:52,083 --> 00:03:53,960 large and long parts, 69 00:03:53,961 --> 00:03:55,875 complex geometries, 70 00:03:55,876 --> 00:03:58,720 reduced access without complete disassembly 71 00:03:58,721 --> 00:04:01,396 are only a few of the inherent difficulties 72 00:04:01,398 --> 00:04:05,571 faced by NDT inspectors in the mining industry. 73 00:04:05,573 --> 00:04:08,240 Many tests are designed as a “best fit” 74 00:04:08,241 --> 00:04:12,386 or require multiple wedge changes or special transducers 75 00:04:12,388 --> 00:04:15,615 to be designed to accommodate the test. 76 00:04:15,616 --> 00:04:17,801 We do have some parts that 77 00:04:17,803 --> 00:04:20,625 we had to draw out in a CAD model 78 00:04:20,626 --> 00:04:24,595 and figure out which angle is the best. 79 00:04:24,596 --> 00:04:28,573 One part for example, we found out that a 55 degree angle 80 00:04:28,575 --> 00:04:32,298 was the right angle you need for that part to find that crack, 81 00:04:32,300 --> 00:04:35,471 and with phased array we can pretty much eliminate 82 00:04:35,473 --> 00:04:37,715 buying a 55 degree wedge 83 00:04:37,716 --> 00:04:41,851 and just use our regular transducer and wedge on that. 84 00:04:41,853 --> 00:04:44,463 Conventional ultrasonics can only be applied 85 00:04:44,465 --> 00:04:46,290 at one angle at a time, 86 00:04:46,291 --> 00:04:49,093 limiting the coverage and detection capability, 87 00:04:49,095 --> 00:04:53,396 especially when the components are in place in the equipment. 88 00:04:53,398 --> 00:04:55,318 If a crack is found 89 00:04:55,320 --> 00:04:58,130 typically only the inspectors measurement 90 00:04:58,131 --> 00:05:01,283 or a report is saved. 91 00:05:01,285 --> 00:05:05,435 Swing shafts are a critical component in draglines. 92 00:05:05,436 --> 00:05:08,745 As it is preferable not to shut down the dragline 93 00:05:08,746 --> 00:05:13,546 manual ultrasonic inspections are usually done in place. 94 00:05:13,548 --> 00:05:17,783 Identification of a crack is left to the operators ability 95 00:05:17,785 --> 00:05:21,168 to identify the defect in the A-scan display 96 00:05:21,170 --> 00:05:23,575 while moving the probe. 97 00:05:23,576 --> 00:05:28,631 With the shaft in place, the ultrasonic inspection is limited. 98 00:05:28,633 --> 00:05:31,353 Phased array offers a sweep of beams 99 00:05:31,355 --> 00:05:35,953 allowing more coverage of the shaft from the accessible area. 100 00:05:35,955 --> 00:05:38,785 Imaging makes the inspection more reliable 101 00:05:38,786 --> 00:05:41,145 especially on shafts with known cracks 102 00:05:41,146 --> 00:05:43,023 that are being monitored. 103 00:05:43,025 --> 00:05:45,953 Adding a scanner or encoder to the inspection 104 00:05:45,955 --> 00:05:48,355 makes these inspections more reliable by 105 00:05:48,356 --> 00:05:53,455 being able to inspect from the same exact position each time. 106 00:05:53,456 --> 00:05:57,255 Draglines and shovels contain many bores or lugs 107 00:05:57,256 --> 00:06:01,145 connecting components together with pins and shafts. 108 00:06:01,146 --> 00:06:02,853 These are high stress areas 109 00:06:02,855 --> 00:06:05,690 that tend to crack on the inner diameter. 110 00:06:05,691 --> 00:06:08,548 They can be difficult to inspect when in place 111 00:06:08,550 --> 00:06:12,236 due to probe access restrictions from other components 112 00:06:12,238 --> 00:06:16,636 and reflections from geometry of the part or other parts. 113 00:06:16,638 --> 00:06:19,661 Phased Array allows more inspectable area 114 00:06:19,663 --> 00:06:21,435 from the accessible area 115 00:06:21,436 --> 00:06:23,280 and the imaging helps the inspector 116 00:06:23,281 --> 00:06:27,281 understand the geometry signals more clearly. 117 00:06:27,283 --> 00:06:30,198 Many other components can also be inspected. 118 00:06:30,200 --> 00:06:34,220 Almost all mining equipment has many sizes of gears. 119 00:06:34,221 --> 00:06:38,956 Gear tooth integrity is crucial to continued operation. 120 00:06:38,958 --> 00:06:40,923 Knowing the extent of cracking 121 00:06:40,925 --> 00:06:45,106 and if a gear tooth will break off is critical. 122 00:06:45,108 --> 00:06:47,743 The inherent benefits of phased array 123 00:06:47,745 --> 00:06:51,115 proven by twenty plus years of use in other industries 124 00:06:51,116 --> 00:06:56,728 are a big advantage for typical mining industry applications. 125 00:06:56,730 --> 00:06:59,243 The use of multiple angles and imaging 126 00:06:59,245 --> 00:07:00,878 increases coverage, 127 00:07:00,880 --> 00:07:02,880 reduces scanning times, 128 00:07:02,881 --> 00:07:04,515 and provides better detection 129 00:07:04,516 --> 00:07:06,550 and characterization capabilities 130 00:07:06,551 --> 00:07:10,538 especially in crack growth monitoring situations. 131 00:07:10,540 --> 00:07:13,151 Phased array can reinforce and enhance 132 00:07:13,153 --> 00:07:15,543 mine predictive maintenance programs 133 00:07:15,545 --> 00:07:18,688 and in turn increase profitability. 134 00:07:18,690 --> 00:07:22,485 Current trends for lower cost and easier to operate units 135 00:07:22,486 --> 00:07:26,953 make these instruments more accessible to mine NDT personnel 136 00:07:26,955 --> 00:07:30,621 enabling the conversion of conventional ultrasonic tests 137 00:07:30,623 --> 00:07:33,905 to phased array ultrasonic tests. 138 00:07:33,906 --> 00:07:37,131 For more information on Olympus mining solutions 139 00:07:37,133 --> 00:07:39,341 contact your local representative 140 00:07:39,343 --> 00:07:49,698 or visit us online at www.olympus-ims.com.