1 00:00:04,900 --> 00:00:06,733 The HVAC and Heat Exchanger Tubing Kit using the Nortec 600D 2 00:00:06,733 --> 00:00:08,833 Inspect more with less 3 00:00:08,833 --> 00:00:12,333 Remote Field Testing Demonstration 4 00:00:12,333 --> 00:00:20,933 In the case 5 00:00:20,933 --> 00:00:33,633 Differential Demonstration Single Frequency 6 00:00:33,633 --> 00:00:37,733 Null 7 00:00:37,733 --> 00:00:40,933 Scan hole 8 00:00:40,933 --> 00:00:43,633 Freeze 9 00:00:43,633 --> 00:00:46,600 Hole signal set to 90 degrees 10 00:00:46,600 --> 00:00:51,633 Gain adjusted to 4 divisions 11 00:00:51,633 --> 00:01:06,900 Calibration complete 12 00:01:06,900 --> 00:01:12,500 Differential Demonstration Dual Frequency with AUTO MIX 13 00:01:12,500 --> 00:01:44,433 Use AUTO MIX to detect defects close to supports 14 00:01:44,433 --> 00:01:53,600 Absolute Demonstration Single Frequency 15 00:01:53,600 --> 00:01:58,900 Null 16 00:01:58,900 --> 00:02:06,633 Scan grooves 17 00:02:06,633 --> 00:02:10,933 Freeze 18 00:02:10,933 --> 00:02:15,166 Set angle to place grooves on appropriate RFT curve 19 00:02:15,166 --> 00:02:19,300 Set gain to touch appropriate RFT curve 20 00:02:19,300 --> 00:02:38,000 Calibration complete 21 00:02:38,000 --> 00:02:41,000 Best Practice Tips 22 00:02:41,000 --> 00:02:44,533 Proper Pulling Technique/Method 23 00:02:44,533 --> 00:02:55,500 Good Pulling Technique/Method Bad Pulling Technique/Method